2.9 km Breakwater and Oil Terminal

CLIENT:

LOCATION:

Port of Fujairah

Fujairah, UAE

YEAR:

2015

ROLE:

Technical Project Engineer

DESCRIPTION:

Construction of a 2.9 km long, deep water breakwater for the Port of Fujairah Oil Terminal 2. The purpose of the breakwater is twofold:
1.  to protect the Oil Terminal berths from waves and currents, and
2. to provide access for oil pipelines and personnel to the VLCC berth and other future berths along the breakwater.